Football Recap: Camp Hill Lions vs. Halifax Wildcats
After having lost a blowout in their previous game against Juniata, Camp Hill was happy to have turned things around on Friday. They never let the Halifax Wildcats onto the board and left with a 7-0 victory. That result was just more of the same for these two, as the Lions also won the last time the pair played back in September of 2015.
One reason for the win was Camp Hill's imposing defense, which managed to get into the backfield for four sacks. In that department, Alex Long was the leader with two.
Camp Hill's win bumped their record up to 4-2. As for Halifax, they dropped their record down to 0-6 with the loss, which was their fifth straight at home dating back to last season.
Camp Hill wasted no time getting back out on the field and has already played their next matchup, a 30-21 defeat against Upper Dauphin Area on the 4th. Halifax has also already played their next match, a 23-6 loss against Susquenita on the 4th.
Article generated by infoSentience based on data entered on MaxPreps