Basketball Recap: Trevin Long Leads a Balanced Attack to Beat Edgewood
By Team Reports
Jan 24, 2025, 6:38am
Basketball Recap: Greencastle Tiger Cubs vs. Edgewood Mustangs
Greencastle won against North Putnam last Friday with 58 points and they decided to stick to that point total again on Saturday. The Greencastle Tiger Cubs came out on top against the Edgewood Mustangs by a score of 58-46. That's more bragging rights for the Tiger Cubs, who also won the pair's last head-to-head.
Greencastle's win was the result of several impressive offensive performances. One of the most notable came from Trevin Long, who went 6 for 10 on his way to 15 points and three steals. Nathan Sutherlin was another key player, putting up 12 points and seven rebounds.
Will Inman and Caden Jones certainly did their best on Saturday to avoid the loss. Inman posted 15 points, while Jones put up 12 points.

Tiger Cubs
01/18/25 vs Edgewood | 58-46 |
01/17/25 vs North Putnam | 58-39 |
The victory made it two in a row for Greencastle and bumps their season record up to 8-5. As for Edgewood, their loss ended a five-game streak of away wins dating back to last season and brought them to 7-5.
Greencastle will head out on the road to face off against South Vermillion at 7:30 p.m. on Friday. Greencastle has been dominant on offense recently, having racked up an incredible 171 points over their last three games. Edgewood has already played their next contest (against Bedford North Lawrence), but no score has been uploaded at the time of writing.
Article generated by infoSentience based on data entered on MaxPreps