Recap: Hooper Bay Warriors vs. Unalakleet Wolfpack        
        
		
            
 The Hooper Bay Warriors entered their tilt with the Unalakleet Wolfpack with seven consecutive wins  but they'll enter their next game with eight. Hooper Bay had just enough and edged Unalakleet out  77-74. Given Hooper Bay's advantage  in MaxPreps' Alaska basketball rankings  (they are ranked second, while Unalakleet is ranked 27th), the result  on Saturday wasn't entirely unexpected.
 Hooper Bay's win  was the result of several impressive offensive performances. One of the most notable came from   Carson Long, who  scored 21 points. Long is on a roll when it comes to points, as he's  now  scored 15 or more in the last 12 games he's  played. Another player making a difference was  Latrell Lake, who  scored 16 points.
 Hooper Bay's win bumped their record up to 16-2. As for Unalakleet, their defeat was  their tenth straight on the road dating back to last season, which  dropped their record down to 6-8.
 Coincidentally,  both teams will both be playing Nenana the next time they take the court. Hooper Bay will head out to face Nenana at 1:00  p.m.  on Tuesday, while Unalakleet will head out to face them  at 1:00  p.m.  on Thursday.